Technical Rule – Code of Practice. DVGW G (A) |June Pressure testing methods for gas transmission/gas distribution. DVGW G – DVGW G Polyethylen gas pipelines with an operating pressure up to and including 10 bar (PE 80, PE and PE-Xa) -. Technical rule [WITHDRAWN] Article is not orderable. DVGW G Compression strength test for pipelines and facilities of gas supply.

Author: Vikasa Tajas
Country: Myanmar
Language: English (Spanish)
Genre: Automotive
Published (Last): 1 August 2014
Pages: 493
PDF File Size: 12.27 Mb
ePub File Size: 3.19 Mb
ISBN: 393-2-25544-490-8
Downloads: 23409
Price: Free* [*Free Regsitration Required]
Uploader: Shakajinn

The pressure loss may amount to: Pressure tests must be carried out by qualified personnel with the relevant knowledge of pipeline engineering, the execution of pressure tests, the measurement techniques and the applicable safety regulations. Dvtw test sections must be defined so that:.

Pressure test ǀ Mannesmann Line Pipe

The pressure loss may amount to:. The test sections must be defined so that: Dvge are two basic test methods: The main test is a test of the entire system, and in particular of the watertightness and proper execution and installation of the pipes, fittings, etc. The joints need not be covered by backfill.

  CHRYSOMYA BEZZIANA PDF

This applies in particular to pipelines with mechanical socket connections.

To stabilize the pipeline section when the soil has finally settled and the cement-mortar lining has absorbed sufficient water. The pressure must be brought back to the test level at regular intervals and in any case after a drop of 0. It is carried out over a period of 3 hours for pipes up to DN The pressure test must be carried out in compliance with the requirements laid down in the relevant rules and regulations, e. The pipeline is to be tested over its entire length or, if necessary, in sections.

Before starting the test, the pipeline must be slowly and evenly filled with water at a rate of about 0. The water loss method see DVGW Worksheet W can be used as an equivalent alternative to the pressure loss method described above. Each pipeline must be subjected to a pressure test after it has been laid. The pressure test is carried out in a maximum of three steps. Carry out as specified by the planner Main dvgd Before the pressure test can be carried out, the pipeline must be covered with backfill material so as to avoid shifts in position, which could cause leaks.

  2N6565 DATASHEET PDF

Pressure test

Water absorption in the cement-mortar pores may initially cause a drop in pressure even if the pipeline is completely vvgw. Drucken Teilen Xing Twitter. Determines the amount of air still in the pipeline. For this reason it is advisable to carry out the pressure test over a period of at least 24 hours.